Thursday 31 December 2009

In The Gutter

Due to the allotment mains water supply being turned off over the Winter, I have decided to invest in a 100 litre water butt and some guttering for the shed.

Heavy watering should be confined to the Summer (when the mains water is on), so this 100 litre butt should be enough to see me through.

I'm beginning to run out of jobs now, so I will have to start digging soon!


Monday 28 December 2009

Plan Update

I have modified my plan to allow for three main beds (for crop rotation) and netting for my brassicas.

I have also included the work that has been done on the plot already.

My next job will be to fit gutters to the shed and run them into a water-butt.

See the virtual tour of my planned plot below.


Sunday 27 December 2009

Mind Me Plums!

I received some garden centre gift vouchers for Christmas and spent some of them on a plum tree (Edwards variety). I have planted it in the middle of the utility area.

Dan came down the allotment today and helped me finish painting the compost bin.

Thursday 24 December 2009

Merry Christmas!


I managed to get down the plot for a while today to do a few small jobs.

I have built the sides for the compost heap from some pallets I acquired. I have given them a coat of green wood preserve.

Due to the drizzle, they were taking too long to dry so they will have to wait until next time for the second coat.

I built a small work bench inside the shed. I used some of the wood that was left over from building my wooden edges.

I also painted my plot number on the side of the shed.

I think I'll have a day off tomorrow (on account of it being Christmas Day) and will probably get back to it on Boxing Day.


Sunday 20 December 2009

Early Christmas Present.

My Christmas present arrived at home late yesterday. It wasn't gift-wrapped, but I'd have guessed what it was anyway.

I wasted no time this morning getting it loaded onto the roof-rack and down to the allotment.

It took me about three hours to build (I was working alone) and another hour to paint it with wood preserve. It all went together very easily, with all parts present.

Next jobs will be to build a work bench and put up some shelves inside the shed and build a compost bin.

Sunday 13 December 2009

Rhubarb & Compost!

I've not done a great deal on the plot this weekend. The shed will be the next big job and I haven't got it yet!

I did nip down there yesterday and planted three rhubarb crowns (two Victoria and one Timperly early).

Saturday 5 December 2009

Wooden Edges. DONE!

Dan and I returned to the allotments this morning and finished off the wooden edges.

I bought another small roll of weed suppressant fabric for the 45cm wide path that will run alongside the 'Link-a-Bord' cloche. We then spread more bark chippings to complete the path.

The plot is completely marked out by the wooden boards now.

The next jobs will be to erect the shed and build the compost bin. And then - let the digging commence!



Friday 4 December 2009

Link-a-Bord Raised Bed Built

After finishing work early today, I made my way to the allotments with about £60 worth of 'Link-a-Bord' plastic raised bed gear that arrived earlier in the week.

You buy it by the meter with all the joints etc and it all slots together very quickly.

It took me about 30 minutes to build a 7m x 1m raised bed.

This raised bed will form the base of my choche and by the Summer will be filled with fat, juicy tomatoes and spicy chillies!